Track Works of the MRT-7 Project
Hyundai Rotem Company
Manille, Philippines
Result of its internationalization strategy and taking advantage of the accumulated knowledge and experience over the last 20 years in the Railway Infrastructure, STECONFER formalized in 2018 a contract for the assembling of track works on MRT-7 Project, Manila-Philippines, with a total length of 23 km (double track), 14 stations and 1 depot facility.
Working with Hyundai Rotem Company, STECONFER has developed and proposed standards and procedures of high quality and guarantee, through Quality Control and Quality Assessment system supported on ISO 9001 standards for the provision of the following systems:
- Railway and Turnout Installation.
- Plinth Track
- Ballasted Track at San José Del Monte Depot
- Restraining (Check) Rail
- Stray Current
- Test & Commissioning
General System Requirements:
- The maximum design speed on Mainline : 80 km/h
- The maximum design speed in Depot (except test track) : 15 km/h
- The maximum design axle load on Mainline : 17 t
- Track Gauge : 1435 mm
- Rail Profile : 54EI (previous UIC54)
- Track Structure: At-Grade, Elevated, Tunnel and Open-Cut section, Direct Fixation Track
- Track Structure in Depot: Ballasted Track