Steconfer 關於我們 联系方式 新闻
中文
  • Português
  • English
  • Español
  • Français
  • Deutsch
  • 中文

STECONFER - Global Rail Infrastructure Specialist

  • Steconfer
  • 關於我們
  • 服務
  • 品質、 環境、安全
  • 研發
  • 目前正在進行的專案:
  • 投资组合
  • 联系方式
  • 新闻

目前正在進行的專案

Track Works of the MRT-7 Project

Hyundai Rotem Company

马尼拉, 菲律宾

Result of its internationalization strategy and taking advantage of the accumulated knowledge and experience over the last 20 years in the Railway Infrastructure, STECONFER formalized in 2018 a contract for the assembling of track works on MRT-7 Project, Manila-Philippines, with a total length of 23 km (double track), 14 stations and 1 depot facility.

Working with Hyundai Rotem Company, STECONFER has developed and proposed standards and procedures of high quality and guarantee, through Quality Control and Quality Assessment system supported on ISO 9001 standards for the provision of the following systems:

  • Railway and Turnout Installation.
  • Plinth Track
  • Ballasted Track at San José Del Monte Depot
  • Restraining (Check) Rail
  • Stray Current
  • Test & Commissioning


    General System Requirements:
  • The maximum design speed on Mainline : 80 km/h
  • The maximum design speed in Depot (except test track) : 15 km/h
  • The maximum design axle load on Mainline : 17 t
  • Track Gauge : 1435 mm
  • Rail Profile : 54EI (previous UIC54)
  • Track Structure: At-Grade, Elevated, Tunnel and Open-Cut section, Direct Fixation Track
  • Track Structure in Depot: Ballasted Track
返回到正在进行的项目

公司地址 | 隐私政策

Copyright © 2018 by Steconfer - Sociedade Técnica de Construções Férreas, S.A

Webdesign by